Eco2 – committed to the future of renewable energy

Bogenlea Wind Turbine

Aberdeenshire Council granted permission for this single turbine application in December 2009.

Eco2 successfully sold the development to Ingenious Media Ltd in early 2014.

After successfully completing the construction phase, Eco2 is currently managing the operation of the wind farm on behalf of the new owners

Site Statistics 
Turbine tower height 58m
Turbine blade length 35m
Number of turbines 1
Single Turbine Capacity Up to 2.3MW
Maximum Wind Farm capacity Up to 2.3MW
Operational Period 25 years
Predicted annual output Approximately 6,447MWh
Electricity equivalent Approximately 1,317 households
Project Benefits 
Environmental Benefits
  • The project will make a significant contribution to the reduction of emissions that are known to cause global warming and acid rain. Over the 25-year lifetime of the project, it will displace approximately 65,000 tonnes of CO2.* 

* The range of CO2 saving is calculated due to the portfolio mix of UK energy supply